Design review
Building design resolves client requirements into a set of instructions for the construction of a building that satisfies those requirements. It tends to follow a relatively consistent process of project definition followed by the iterative development of an increasingly detailed solution.
It is important that regular reviews are carried out during the design process to ensure that the developing design properly reflects the client's requirements and that the design and budget do not diverge.
Design reviews are typically co-ordinated by the lead designer. They may involve the consultant team, the client, independent client advisers and where there is one, the contractor. They may also involve external organisations who specialise in undertaking design reviews.
Design reviews may consider:
- Design quality.
- Value management.
- Design risk management.
- Risks (other than health and safety risks) associated with the design, such as the use of innovative components, long lead time items and and non-standard elements of the design.
- Design co-ordination.
- Procurement route.
- Compliance with the project brief. The project brief should be amended if necessary.
- Compliance with procedures laid out in project execution plan. The project execution plan should be amended if necessary.
- Compliance with relevant legislation, circulars, guides, codes and regulations (in particular the building regulations). This may require consultation with statutory authorities such as the local planning authority, building control officers or the emergency services, who may have views on fundamental aspects of the design.
- Contingency plans.
- The feasibility, buildability, packaging, cost and programming of the design.
- Co-ordination and integration of different elements or packages of the design.
- The need for specialist designers or specialist contractors.
- The need for mock-ups, samples, tests and inspections (in the later stages of the design process it may be appropriate to visit the premises of specialist contractors or suppliers to assess samples, mock-ups and tests).
- Sustainability issues, such as: compliance with any existing client policies or targets, site selection, availability of transport, the local availability of resources and services, the local infrastructure, local ecology, landscape, energy use and energy source, flexibility and durability, waste and water management, material selection, recycling, pollution, resilience to climate change, dismantling and demolition or re-use.
- Development of site waste management plan, including opportunities to reduce consumption of resources and generation of waste.
- Assessment of protocols for submitting design information (for example building information modelling (BIM) protocols).
Following a design review, the lead designer will generally compile comments received as a and instruct the consultant team to amend or develop the design as necessary.
In some circumstances it may be appropriate to commission design reviews from independent client advisers or from specialist design review organisations. These reviews are sometimes referred to as design audits.
On public sector projects, the government requires that gateway reviews are carried out at key points during the development of the project. Gateway reviews are independent peer reviews carried out by a review team on behalf of the senior responsible owner. The review team then prepare a confidential review report for the senior responsible owner.
[edit] Related articles on Designing Buildings Wiki
- Benchmarking.
- BREEAM independent party.
- Client design advisor.
- Concept design.
- Concept architectural design.
- Concept architectural design checklist.
- Crime Prevention Design Advisor.
- Detailed design.
- Design process essentials.
- Design quality.
- Design responsibility matrix.
- Design review panels.
- Design team meeting.
- Design web.
- Design risk management.
- Design workshop.
- Key performance indicators.
- Independent client advisers.
- OGC.
- Presenting to design review panels.
- Qualitative design review.
- Samples and mock-ups.
- Stakeholders.
- Stakeholder matrix.
- User panels.
- Value management.
[edit] External references
Featured articles and news
ECA digital series unveils road to net-zero.
Retrofit and Decarbonisation framework N9 launched
Aligned with LHCPG social value strategy and the Gold Standard.
Competence framework for sustainability
In the built environment launched by CIC and the Edge.
Institute of Roofing members welcomed into CIOB
IoR members transition to CIOB membership based on individual expertise and qualifications.
Join the Building Safety Linkedin group to stay up-to-date and join the debate.
Government responds to the final Grenfell Inquiry report
A with a brief summary with reactions to their response.
A brief description and background to this new February law.
Everything you need to know about building conservation and the historic environment.
NFCC publishes Industry White Paper on Remediation
Calling for a coordinated approach and cross-departmental Construction Skills Strategy to manage workforce development.
'who blames whom and for what, and there are three reasons for doing that: legal , cultural and moral"
How the Home Energy Model will be different from SAP
Comparing different building energy models.
Mapping approaches for standardisation.
UK Construction contract spending up at the start of 2025
New construction orders increase by 69 percent on December.
Preparing for the future: how specifiers can lead the way
As the construction industry prepares for the updated home and building efficiency standards.
Embodied Carbon in the Built Environment
A practical guide for built environment professionals.
Updating the minimum energy efficiency standards
Background and key points to the current consultation.
Heritage building skills and live-site training.