Design review
Building design resolves client requirements into a set of instructions for the construction of a building that satisfies those requirements. It tends to follow a relatively consistent process of project definition followed by the iterative development of an increasingly detailed solution.
It is important that regular reviews are carried out during the design process to ensure that the developing design properly reflects the client's requirements and that the design and budget do not diverge.
Design reviews are typically co-ordinated by the lead designer. They may involve the consultant team, the client, independent client advisers and where there is one, the contractor. They may also involve external organisations who specialise in undertaking design reviews.
Design reviews may consider:
- Design quality.
- Value management.
- Design risk management.
- Risks (other than health and safety risks) associated with the design, such as the use of innovative components, long lead time items and and non-standard elements of the design.
- Design co-ordination.
- Procurement route.
- Compliance with the project brief. The project brief should be amended if necessary.
- Compliance with procedures laid out in project execution plan. The project execution plan should be amended if necessary.
- Compliance with relevant legislation, circulars, guides, codes and regulations (in particular the building regulations). This may require consultation with statutory authorities such as the local planning authority, building control officers or the emergency services, who may have views on fundamental aspects of the design.
- Contingency plans.
- The feasibility, buildability, packaging, cost and programming of the design.
- Co-ordination and integration of different elements or packages of the design.
- The need for specialist designers or specialist contractors.
- The need for mock-ups, samples, tests and inspections (in the later stages of the design process it may be appropriate to visit the premises of specialist contractors or suppliers to assess samples, mock-ups and tests).
- Sustainability issues, such as: compliance with any existing client policies or targets, site selection, availability of transport, the local availability of resources and services, the local infrastructure, local ecology, landscape, energy use and energy source, flexibility and durability, waste and water management, material selection, recycling, pollution, resilience to climate change, dismantling and demolition or re-use.
- Development of site waste management plan, including opportunities to reduce consumption of resources and generation of waste.
- Assessment of protocols for submitting design information (for example building information modelling (BIM) protocols).
Following a design review, the lead designer will generally compile comments received as a and instruct the consultant team to amend or develop the design as necessary.
In some circumstances it may be appropriate to commission design reviews from independent client advisers or from specialist design review organisations. These reviews are sometimes referred to as design audits.
On public sector projects, the government requires that gateway reviews are carried out at key points during the development of the project. Gateway reviews are independent peer reviews carried out by a review team on behalf of the senior responsible owner. The review team then prepare a confidential review report for the senior responsible owner.
[edit] Related articles on Designing Buildings Wiki
- Benchmarking.
- BREEAM independent party.
- Client design advisor.
- Concept design.
- Concept architectural design.
- Concept architectural design checklist.
- Crime Prevention Design Advisor.
- Detailed design.
- Design process essentials.
- Design quality.
- Design responsibility matrix.
- Design review panels.
- Design team meeting.
- Design web.
- Design risk management.
- Design workshop.
- Key performance indicators.
- Independent client advisers.
- OGC.
- Presenting to design review panels.
- Qualitative design review.
- Samples and mock-ups.
- Stakeholders.
- Stakeholder matrix.
- User panels.
- Value management.
[edit] External references
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.